The service sector is the largest contributor to GDP in India. Thissector accounts for 54 per cent of economic output and grew by an unprecedented 9.8 per cent. IMF forecast estimates that by 2010 this will be around 58 per cent, on par with a midlevel developed country. The service sector has been driven by IT exports which have grown at a CAGR of 26 per cent over the last 4 years. This was mainly the result of significant increases in the demand for domestic services.

As per the statistics of developed countries, services account for around 75 per cent of the jobs and 70 per cent of the Gross National Product (GNP) capital. In the industrial market, many services are offered to facilitate the process of production, finance and marketing. Manufacturers, wholesalers and retailers sell some services along with goods. They buy many services in the conduct of their business. There are specialized services firms selling their services to the industry. Industry requires the services of transport, storage, finance, insurance and communication, as these facilitate business operations. The service sector comprises trade, hotels and restaurants, transport, storage, communication, financing, insurance, real estate and business services, community services (public administration and defence) and other services. This sector provides services of final consumption nature as well as intermediate nature, the latter accounting for a major share. Substantial parts of services such as transport and communications are in the form of intermediate inputs for production of other goods and services. A growing urbanization too has contributed to the growth in service sector.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)

Maintenance of electrical equipment and the maintenance function in general, are key subjects ... Read More

Capacity : Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 76.00Lakhs
Add To Inquiry Basket
Flexographic Printing Industry
Flexographic Printing Industry

Flexographic Printing Industry. Flexography or Flexo Printing Business. Business Oppo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Bottling Plant
LPG Bottling Plant

LPG cylinder filling plants vary considerably in size, complexity and layout. The type and size depends on such factor... Read More

Capacity : LPG Cylinders (5 Kgs Size 1360 Nos/day) : 2040 MT/Annum LPG Cylinders (14.2 Kgs Size 1000 Nos/day)
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 919.00Lakhs
Add To Inquiry Basket
LPG Cylinder Refilling Plant. LP Gas Industry
LPG Cylinder Refilling Plant. LP Gas Industry

LPG Cylinder Refilling Plant. LP Gas Industry. How to Start a Liquefied Petroleum Gas... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Outdoor & Indoor Entertainment Centre
Outdoor & Indoor Entertainment Centre

An entertainment center is a piece of furniture designed to house consumer electronic appliances and components, such ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
School (CBSE Pattern)
School (CBSE Pattern)

The importance of education was well recognized in India, ‘Swadeshepujyate raja, vidwansarvatrapujyate’ “... Read More

Capacity : KG to 12th Standard Students : 2000 Students/Annum
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):13.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1098.00Lakhs
Add To Inquiry Basket
Nursing Home
Nursing Home

Nursing homes are a type of residential care that provide around-the-clock nursing care for elderly people. Twenty-four-hour nursing care is availa... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Holiday Resort, Timeshare Resorts Business Opportunity
Holiday Resort, Timeshare Resorts Business Opportunity

The Indian tourism and hospitality industry has materialized as one of the key drivers of growth among the services sectors in India. It contribute... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setting Up a Hospital in India
Setting Up a Hospital in India

Setting Up a Hospital in India. Investment Opportunity in Healthcare Industry. Start a Hospital in India.

Read More
Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setting Up Profitable Microbrewery, Brewpub, Craft Brewery Restaurant Business in India
Setting Up Profitable Microbrewery, Brewpub, Craft Brewery Restaurant Business in India

Restaurant! It is a most popular name in the present world. Many people do not have their meal in their home, they always take meal and food from r... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Industrial Training Institute
Industrial Training Institute

Industrial Training Institute (I.T.I)

Read More

Capacity : Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14
Plant and Machinery cost: 314.25 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):45.00 %
TCI :2476.00 Lakhs
Cost of Project : 2476.00Lakhs
Add To Inquiry Basket
BANQUET HALL
BANQUET HALL

Indian traditions are so rich and our emotional standards are so high that most of the ceremonies/functions become simply a monument of show-off an... Read More

Capacity :
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):75.00%
Break Even Point (BEP):29.00 %
TCI :496.00 Lakhs
Cost of Project : 496.00Lakhs
Add To Inquiry Basket
Five Star Hotel & Business Shopping Mall
Five Star Hotel & Business Shopping Mall

Five star hotel contents business center by making luxurious shops inside the hotel for selling consumer goods, articles and beverages, is wonderfu... Read More

Capacity :
Plant and Machinery cost: 5100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):59.00%
Break Even Point (BEP):29.00 %
TCI :30000.00 Lakhs
Cost of Project : 30000.00Lakhs
Add To Inquiry Basket
Golf Course
Golf Course

Golf is quite a respectable and expensive game. Participants of golf course are considered as regardable and honourable people of the society. Golf... Read More

Capacity : 20000 MEMBERS
Plant and Machinery cost: 1962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):34.00 %
TCI :2100.00 Lakhs
Cost of Project : 2100.00Lakhs
Add To Inquiry Basket
MANAGEMENT COLLEGE
MANAGEMENT COLLEGE

In modern times of upsurging business network in regard to novel business strategies being implemented, MBA College occupies a conspicuous niche, a... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
BACHELOR OF PHYSIOTHERAPY COLLEGE (B Pt COLLEGE)
BACHELOR OF PHYSIOTHERAPY COLLEGE (B Pt COLLEGE)
Read More
Capacity : 0.00
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
SAFARI PARK
SAFARI PARK

A safari park, sometimes known as a wildlife park is a zoo like commercial tourist attraction where visitors’ car drive in their... Read More

Capacity : Visitors 6000 Nos./Day
Plant and Machinery cost: 1099.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):30.00 %
TCI :49486.00 Lakhs
Cost of Project : 49486.00Lakhs
Add To Inquiry Basket
MANAGEMENT COLLEGE (BBA, BCA, MBA, MCA)
MANAGEMENT COLLEGE (BBA, BCA, MBA, MCA)

In modern times of unpsurging business network in regard to novel business strategies being implemented, management college occupies a conspicuous ... Read More

Capacity : 660 Nos. Students, Hostlers 90% = 600 Nos.
Plant and Machinery cost: 116.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):52.00 %
TCI :85.00 Lakhs
Cost of Project : 85.00Lakhs
Add To Inquiry Basket
OLD AGE HOME (Senior Citizen House), ORPHAN CHILDREN HALL AND DHARAMSHALA
OLD AGE HOME (Senior Citizen House), ORPHAN CHILDREN HALL AND DHARAMSHALA
Old age home is an establishment where retired persons as well as old man can stay safely and happily by paying a reasonable amount per day or per mon... Read More
Capacity : Old Age Home 200 Room with Balcony, Open Land Lawn & Garden 2 Acre, Orphan Children Hall 100 Beds
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):26.00 %
TCI :375.00 Lakhs
Cost of Project : 375.00Lakhs
Add To Inquiry Basket
THREE STAR HOTEL
THREE STAR HOTEL

India offers myriad exciting experiences to tourists. The country boasts of the world's highest mountains, miles of coastline with excellent beache... Read More

Capacity : Single Room - 30 Nos. Double Room - 40 Nos. Suites - 10 Nos. Banquet Hall - 1 Number
Plant and Machinery cost: 327.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):37.00 %
TCI :1500.00 Lakhs
Cost of Project : 1500.00Lakhs
Add To Inquiry Basket
INFORMATION TECHNOLOGY (IT) Training Centre
INFORMATION TECHNOLOGY (IT) Training Centre

INFORMATION TECHNOLOGY (I.T.) Training Centre

Information technology is a rapidly ... Read More

Capacity : 0
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):42.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Water Park
Water Park

In ancient India, there was large use of water in the Tapovana, and different Ashrams in the forests. Elephanta caves in the Maharashtra can be con... Read More

Capacity : 1000 visitors / Day
Plant and Machinery cost: 84.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):38.00 %
TCI :362.00 Lakhs
Cost of Project : 362.00Lakhs
Add To Inquiry Basket
NURSERY SCHOOL
NURSERY SCHOOL

A nursery school is a school for children between the ages of three and five, staffed by qualified teachers and other professionals who encourage a... Read More

Capacity : 400 Children
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):39.00 %
TCI :66.00 Lakhs
Cost of Project : 66.00Lakhs
Add To Inquiry Basket
Solar Photovoltaic System
Solar Photovoltaic System

Solar cell is made from two words, s... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Nature Care Centre
Nature Care Centre

God makes the universe in which world is one place. Where human beings other animals and plant kingdoms are lived. In this world God has created so... Read More

Capacity : 20 Acres
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 14.00
Rate of Return (ROR):18.21%
Break Even Point (BEP):5759.00 %
TCI :250.00 Lakhs
Cost of Project : 250.00Lakhs
Add To Inquiry Basket
Fast Food Center (Restaurant) With Kids Plaza
Fast Food Center (Restaurant) With Kids Plaza

India is one of the most populations growing country of the world. Urgent need of human beings is food and dress. Now a day there is a scarcity of ... Read More

Capacity :
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 30.00
Rate of Return (ROR):41.81%
Break Even Point (BEP):61.35 %
TCI :55.00 Lakhs
Cost of Project : 55.00Lakhs
Add To Inquiry Basket
Holiday Resort & Entertainment Centre
Holiday Resort & Entertainment Centre

There is rapid urbanisation cause of exploitation of nature. Due to exploitation of nature pollution will be increase and thus healthy human life h... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Pharmaceutical College (B Pharma & D Pharma)
Pharmaceutical College (B Pharma & D Pharma)

Pharmaceutical College (B. Pharma & D. Pharma)

There is need of pharmaceutical ... Read More

Capacity : B. Pharma 100 Student, D. Pharma 150 Student
Plant and Machinery cost: 125.00 Lakhs
Working Capital : 33.93
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :396.43 Lakhs
Cost of Project : 396.43Lakhs
Add To Inquiry Basket
Old Age Home Orphan Children Hall and Dharam Shala
Old Age Home Orphan Children Hall and Dharam Shala
Old age home is an establishment where retired persons as well as old man can stay safely and happily. Though this old age home will be a business cen... Read More
Capacity : 200 Rooms Old Age Home 100 Beds Orphan Children Hall 25 Rooms Dharamshala
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 17.00
Rate of Return (ROR):5.60%
Break Even Point (BEP):81.91 %
TCI :363.00 Lakhs
Cost of Project : 363.00Lakhs
Add To Inquiry Basket
Greenhouse (Plant Micropropagation)
Greenhouse (Plant Micropropagation)

Green houses are frequently used to control or modify the exciting environmental factor, which effects the plant growth. A green house is a structu... Read More

Capacity : 10000 NOS./day
Plant and Machinery cost: 139.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):47.00 %
TCI :462.00 Lakhs
Cost of Project : 462.00Lakhs
Add To Inquiry Basket
Granite Tiles, Slab and Monuments
Granite Tiles, Slab and Monuments

Granite Slab and Tiles are mainly used for wall paneling and facades. Today in Europe and in Western Countries and in India, architect and builders... Read More

Capacity : 1000.00 Tiles/Day & 100 Monument/Day, 5 Slab/Day
Plant and Machinery cost: 182.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):45.00 %
TCI :488.00 Lakhs
Cost of Project : 488.00Lakhs
Add To Inquiry Basket
5 Star Hotel
5 Star Hotel

he hotel industry is an important component of tourism industry. Its foreign exchange earning capacity is also high. The irritation of economic ref... Read More

Capacity : 150 Rooms
Plant and Machinery cost: 2000.00 Lakhs
Working Capital : 237.00
Rate of Return (ROR):30.68%
Break Even Point (BEP):47.21 %
TCI :1000.00 Lakhs
Cost of Project : 1000.00Lakhs
Add To Inquiry Basket
Setting Up of Planetarium
Setting Up of Planetarium

Setting Up of Planetarium. Profitable Investment Opportunity in Astronomy Education S... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start IV Cannula Manufacturing Unit (Pen Style)
Start IV Cannula Manufacturing Unit (Pen Style)

An IV (Intravenous) Cannula, particularly the "Pen Style," is a medical device used for admini... Read More

Capacity : -
Plant and Machinery cost: 1284.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 5103.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Gloves (Powder Free)
Disposable Nitrile Gloves (Powder Free)

Nitrile gloves are a type of disposable gloves made from synthetic rubber, this means there is no risk of latex ... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000.0 Pcs. / day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2925.00Lakhs
Add To Inquiry Basket
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices)
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices)

Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup an Industrial Park
Setup an Industrial Park

 

Parks, community ... Read More

Capacity : Type 1 Industrial Plots Area 500 sq.mt. Size 90 Nos Type 2 Industrial Plots Area 1000 sq.mt. Size 4
Plant and Machinery cost: 329.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):18.00 %
TCI :0.00 Lakhs
Cost of Project : 30642.00Lakhs
Add To Inquiry Basket
Business Plan for Startup Multispeciality Hospital Business Ideas with High Profits 100 Bedded Multispeciality Hospital Profitable Project for Investment in Healthcare Industry
Business Plan for Startup Multispeciality Hospital Business Ideas with High Profits 100 Bedded Multispeciality Hospital Profitable Project for Investment in Healthcare Industry

Introduction: Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
School (CBSE Pattern)
School (CBSE Pattern)

A school is an institution designed to provide learning spaces and learning environments for the teaching of students ... Read More

Capacity : 0
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 1261.00Lakhs
Add To Inquiry Basket
Paediatric Hospital
Paediatric Hospital

Children's hospital is a hospital which offers its services exclusively to children and adolescents. Most children's h... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Orphanage with School
Orphanage with School

An orphanage is a place where children without parents are cared for and housed. If a child has no parents — bec... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Call Centre (International)
Call Centre (International)

A call centre or call center is a centralised office used for receiving or transmitting a large volume of requests by ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Newspaper Printing
Newspaper Printing

Newspaper, publication usually issued daily, weekly, or at other regular times that provides news, views, features, and other information of public... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Air Taxi (Rental)
Air Taxi (Rental)

An air taxi is a small commercial aircraft which makes short flights on demand. The global air taxis market was valued at USD 27.69 billion in 2017... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Cylinder Refilling Plant
LPG Cylinder Refilling Plant

Liquefied Petroleum Gas is a Propane / Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burnin... Read More

Capacity : 16000 Pcs./Day
Plant and Machinery cost: 1391.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):31.00 %
TCI :0.00 Lakhs
Cost of Project : 11166.00Lakhs
Add To Inquiry Basket
E-commerce
E-commerce

E-commerce has become an important part of many multilateral negotiations such as Regional Comprehensive Economic Partnership (RCEP), WTO and BRICS... Read More

Capacity : Home Appliances under 10000/- : 160 Nos./Day Home Appliances above 10000/- : 80 Nos./Day Mobile
Plant and Machinery cost: 70.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 1035.00Lakhs
Add To Inquiry Basket
Medical College with Hospital (750 Bedded)
Medical College with Hospital (750 Bedded)

A medical college is meant to impart education of medical field to students to qualify them as doctors in different special... Read More

Capacity : Medical College 500 Students & Hospital 750 Beded
Plant and Machinery cost: 2047.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 10747.00Lakhs
Add To Inquiry Basket
HOTEL
HOTEL

Hotel industry totally depends on the growth of the tourism as well as proper import and export growth of the country. If there are good countries ... Read More

Capacity : Hotel (Total 60 Rooms) Single Room - 30 Nos., Double Room - 30 Nos., Discotheque - 1 No.
Plant and Machinery cost: 267.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):35.00 %
TCI :1264.00 Lakhs
Cost of Project : 1264.00Lakhs
Add To Inquiry Basket
INDUSTRIAL TRAINING INSTITUTE (ITI)
INDUSTRIAL TRAINING INSTITUTE (ITI)

India has one of the largest technical manpower in the world. However, compared to its population it is not significant and there is a tremendous s... Read More

Capacity : 0
Plant and Machinery cost: 300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):47.00 %
TCI :988.00 Lakhs
Cost of Project : 988.00Lakhs
Add To Inquiry Basket
Dry Cleaning and Laundry Unit
Dry Cleaning and Laundry Unit
Profile: Dry Cleaning unit is servicing industry. The process of conventional cleaning, prevailing in nook and corner of cities and towns is slowly ... Read More
Capacity : 510 pieces/day, 210 pieces dry cleaning/day, 300 pieces washing and iron/day
Plant and Machinery cost: 15.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):46.00 %
TCI :62.00 Lakhs
Cost of Project : 62.00Lakhs
Add To Inquiry Basket
HOLIDAY RESORT (THREE STAR GRADE)
HOLIDAY RESORT (THREE STAR GRADE)

Tourism as an industry has been flourishing and growing since time immemorial, but it has been in the last few decades that specific attention has ... Read More

Capacity : 27 Rooms, (3 Cottages, 16 Deluxe & 8 Suits)
Plant and Machinery cost: 631.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):35.00 %
TCI :945.00 Lakhs
Cost of Project : 945.00Lakhs
Add To Inquiry Basket
PHARMACY COLLEGE (B-Pharma & D-Pharma)
PHARMACY COLLEGE (B-Pharma & D-Pharma)

There is need of pharmaceutical college in India for the development of country and give the better opportunity to the general merit. Now-a-days hi... Read More

Capacity : 60 Students in branch of B-Pharma, 60 Students in branch of D-Pharma
Plant and Machinery cost: 85.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):46.00 %
TCI :700.00 Lakhs
Cost of Project : 700.00Lakhs
Add To Inquiry Basket
ENGINEERING COLLEGE
ENGINEERING COLLEGE

There is need of engineering college in India for the development of country and give the better opportunity to the general merit. But in our count... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Amusement Park
Amusement Park

Amusement park is the most popular entertaining place with the latest technological developments, which gives comfort and pleasure. It is not only ... Read More

Capacity : 4000.00 Visitors/day
Plant and Machinery cost: 1650.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):57.00 %
TCI :2041.00 Lakhs
Cost of Project : 2041.00Lakhs
Add To Inquiry Basket
Dental College
Dental College

Dental education occupies a place of pride in the field of medical studies. The basic aim of the dental colleges is to provide health-oriented cour... Read More

Capacity : 100 Students in Dental College ,4 year course with Dental College
Plant and Machinery cost: 674.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):43.00 %
TCI :1642.00 Lakhs
Cost of Project : 1642.00Lakhs
Add To Inquiry Basket
Amusement Park Cum Water Park
Amusement Park Cum Water Park

The human life in cities is becoming more and more mechanical because of noise pollution, environment pollution. For relaxed and peaceful environme... Read More

Capacity : 4000 Entry/Day, 750 Visitor/Day, 20 Room Hotel & 300 Meals/day Resturant
Plant and Machinery cost: 1900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :2600.00 Lakhs
Cost of Project : 2600.00Lakhs
Add To Inquiry Basket
Power Project For Glass Industry
Power Project For Glass Industry

Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is... Read More

Capacity : 110 MW/Day
Plant and Machinery cost: 453.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):56.00%
Break Even Point (BEP):52.00 %
TCI :494.00 Lakhs
Cost of Project : 494.00Lakhs
Add To Inquiry Basket
Tyre Retreading And Repairing Facility For Heavy Vehicles
Tyre Retreading And Repairing Facility For Heavy Vehicles

Automobile tyres are quite costly in India, and are manufactured only by big manufacturers. Retreading is replacement of worn, cut or loose treads ... Read More

Capacity : 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):89.00%
Break Even Point (BEP):28.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Commercial Market
Commercial Market
Market is a place, from where we can purchase everything of our daily use. The things we purchase from market a mainly of two types (i) consumable and... Read More
Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 1.70
Rate of Return (ROR):30.12%
Break Even Point (BEP):55.03 %
TCI :63.80 Lakhs
Cost of Project : 63.80Lakhs
Add To Inquiry Basket
DTP, E-mail, Internet and leased access for Commercial Purpose
DTP, E-mail, Internet and leased access for Commercial Purpose

D.T.P., E-mail, Internet and leased access for Commercial Purpose

Evolution of chea... Read More

Capacity : 200 Pages/Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 6.00
Rate of Return (ROR):50.97%
Break Even Point (BEP):52.86 %
TCI :20.00 Lakhs
Cost of Project : 20.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Workshop for Motors of Lo... Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U 30.00 76.00
Flexographic Printing Ind... 0 0.00 0.00
LPG Bottling Plant LPG Cylinders (5 Kgs Size 1360 Nos/day) : 2040 MT/Annum LPG Cylinders (14.2 Kgs Size 1000 Nos/day) 28.00 919.00
LPG Cylinder Refilling Pl... 0 0.00 0.00
Outdoor & Indoor Entertai... 0 0.00 0.00
School (CBSE Pattern) KG to 12th Standard Students : 2000 Students/Annum 13.00 1098.00
Nursing Home 0 0.00 0.00
Holiday Resort, Timeshare... 0 0.00 0.00
Setting Up a Hospital in ... 0 0.00 0.00
Setting Up Profitable Mic... 0 0.00 0.00
Industrial Training Insti... Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14 27.00 2476.00
BANQUET HALL 75.00 496.00
Five Star Hotel & Busines... 59.00 30000.00
Golf Course 20000 MEMBERS 26.00 2100.00
MANAGEMENT COLLEGE 0.00 0.00
BACHELOR OF PHYSIOTHERAPY... 0.00 0.00 0.00
SAFARI PARK Visitors 6000 Nos./Day 36.00 49486.00
MANAGEMENT COLLEGE (BBA, ... 660 Nos. Students, Hostlers 90% = 600 Nos. 23.00 85.00
OLD AGE HOME (Senior Citi... Old Age Home 200 Room with Balcony, Open Land Lawn & Garden 2 Acre, Orphan Children Hall 100 Beds 36.00 375.00
THREE STAR HOTEL Single Room - 30 Nos. Double Room - 40 Nos. Suites - 10 Nos. Banquet Hall - 1 Number 48.00 1500.00
INFORMATION TECHNOLOGY (I... 0 46.00 200.00
Water Park 1000 visitors / Day 41.00 362.00
NURSERY SCHOOL 400 Children 42.00 66.00
Solar Photovoltaic System 0 0.00 0.00
Nature Care Centre 20 Acres 18.21 250.00
Fast Food Center (Restaur... 41.81 55.00
Holiday Resort & Entertai... 0.00 0.00
Pharmaceutical College (B... B. Pharma 100 Student, D. Pharma 150 Student 0.00 396.43
Old Age Home Orphan Child... 200 Rooms Old Age Home 100 Beds Orphan Children Hall 25 Rooms Dharamshala 5.60 363.00
Greenhouse (Plant Micropr... 10000 NOS./day 31.00 462.00
12345
« Back1 2 3Next »

Showing 1 - 60 of 132 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR